$15.22 million new building, 60,000 sf, which features conference and meeting facilities
Tall exterior windows provide campus views; for winter comfort, warm air is provided by hot water radiant fin tubing installed below the windows
Building heating and cooling is provided by two 30,000 CFM air handling units; return air systems manage building pressurization; DDC controlled zones with variable air volume units with hot water reheat coils
Systems are tied into the campus chilled water and steam systems; relief air exits through louvers in the underground garage to provide ventilation and partial climate control for the garage
Use of natural lighting to reduce lighting costs
Mass notification/fire alarm system
Commissioning services included air handling units, heat exchanger, pumps, building automation system, lighting controls, and plumbing systems
Merit Award Winner (American Council of Engineering Companies)
We’re people who make a difference. Our team meets challenges and helps clients find cost-effective solutions every day.
Copyright All Rights Reserved © 2020 Farris Engineering, Inc. | Privacy | Contact