District Energy Corp Southwest 40th Thermal Energy Facility
Lincoln, NE
- Feasibility study proved geothermal heating and cooling system, which received a $5 million ARRA grant from the Department of Energy Geothermal Technologies Program.
- $16 million, 270,000 sf facility, with 25,000 sf central plant.
- 25 nominal 70‑ton water‑to‑water heat pumps for peak cooling load of 858 tons and peak heating load of 6,000 MBh.
- 667-bore geothermal well field.
- Three 2 MW emergency generators.
- Expandable system design according to availability of resources.
- Engineering Excellence Merit Award Winner, ACEC Nebraska, 2013.