New $5.366 million addition to accommodate a cafeteria/multipurpose room, fully equipped kitchen, music room, classrooms, storage, and competition gym with capacity for 1,000 people (Lower Level – 13,546 sf, Upper Level – 13,682 sf)
Mechanical, electrical, and plumbing (MEP) design for the addition to add more water source heat pumps with energy recovery units (ERVs), and packaged rooftop units. Heat pumps were tied into the existing building loop
Theatrical lighting, sound system, integrated technology system, and added ventilation for comfort of larger number of occupants