$1.25 million, HVAC upgrade
Included computerized air conditioning systems, refrigerant chillers, air-cooled condenser units, uninterruptible power supplies (UPS), maintenance by-pass switches, and a new stand alone electrical system to reduce power interruptions
Project phasing to reduce downtime
Instrumentation and controls necessary for operation and monitoring of the center, including link to main building energy management
We’re people who make a difference. Our team meets challenges and helps clients find cost-effective solutions every day.
Copyright All Rights Reserved © 2020 Farris Engineering, Inc. | Privacy | Contact