Newton Community School District Administration Building Renovation and Security Upgrade

Newton, IA

$2.29 million renovation of 21,000 sf building from grocery store to administration building

Two rooftop variable air volume systems with DX cooling, energy recovery wheels, and CO2 control of outside air

17 VAV terminal units have hot water coils

Heating from two 95% efficient condensing boilers

Hot water pumps have variable frequency drives

DDC controls with occupancy control

Domestic hot water provided by a gas-fired heater

Entire building fire sprinkled per NFPA 13

New fire alarm system

Main electrical switchboard was replaced

Dimmable LED lighting with occupancy sensors

LED exterior parking lot and building light

Digital telephone system installed throughout

Card access security control system

Video surveillance cameras

Separate mechanical system for telecommunications room controls moisture and supports equipment longevity

Newton Community School District Administration Building Renovation and Security Upgrade
img_20160906_161905330
20160906_163430
20160906_161915
Related Projects