Newton Community School District Administration Building Renovation and Security Upgrade
Newton, IA
- $2.29 million renovation of 21,000 sf building from grocery store to administration building.
- Two rooftop variable air volume systems with DX cooling, energy recovery wheels, and CO2 control of outside air.
- 17 VAV terminal units have hot water coils.
- Hot water pumps have variable frequency drives.
- DDC controls with occupancy control.
- Domestic hot water provided by a gas-fired heater.
- Entire building fire sprinkled per NFPA 13.
- New fire alarm system.
- Main electrical switchboard was replaced.
- Dimmable LED lighting with occupancy sensors.
- LED exterior parking lot and building light.
- Digital telephone system installed throughout.
- Card access security control system.
- Video surveillance cameras.
- Separate mechanical system for telecommunications room controls moisture and supports equipment longevity.