$15.22 million new building, 60,000 sf, which features conference and meeting facilities
Tall exterior windows provide campus views; for winter comfort, warm air is provided by hot water radiant fin tubing installed below the windows
Building heating and cooling is provided by two 30,000 CFM air handling units; return air systems manage building pressurization; DDC controlled zones with variable air volume units with hot water reheat coils
Systems are tied into the campus chilled water and steam systems; relief air exits through louvers in the underground garage to provide ventilation and partial climate control for the garage
Use of natural lighting to reduce lighting costs
Mass notification/fire alarm system
Commissioning services included air handling units, heat exchanger, pumps, building automation system, lighting controls, and plumbing systems
Merit Award Winner (American Council of Engineering Companies)